Pouring concrete is the easy bit. The hard work happens before the mixer arrives. A foundation transfers the building's weight into the ground, and if that ground is soft, uneven or badly compacted, the concrete will crack, settle or rotate. In the UK, many domestic subsidence issues start with poor ground preparation, not with the concrete itself. Whether you are building an extension, garage, garden room or shed base, you need a stable, level and well-drained formation. Skipping steps here can cost thousands in underpinning and repairs. With careful excavation, proper compaction and a little patience, you can get it right first time.
Before you break ground, find out what you are dealing with. Dig trial holes to identify soil type and topsoil depth. Topsoil is organic and compressible; strip it back completely. Many UK gardens have 150–300mm of topsoil over clay, sand, chalk or made ground. Made ground — old ash, rubble or builders' waste — is unpredictable and often needs excavating and replacing with compacted stone. If you are near large trees, especially poplar, willow or oak, check for roots and consider shrinkable clay. A structural engineer or building control officer can advise on depth and width.
Set out using profiles and string lines, not just a tape. Pegs at each corner with a line level or laser level let you check diagonals and square corners. Mark trench width with sand or spray paint. A typical single-storey extension strip foundation might be 600mm wide, but your engineer's drawings take priority. Allow working space for tools — at least 500mm either side if digging by hand.
Depth matters for frost and ground movement. In the UK, foundations are usually at least 1m below ground level, but clay soils with trees can require 1.5m to 2.5m. The trench bottom must be firm, undisturbed subsoil. Do not dig it fluffy and pour concrete on top. Use a mini excavator for larger jobs, but finish by hand near services and boundaries. Keep trench sides vertical and spoil well back.
A level formation spreads load evenly. Use a plate compactor or vibrating roller on the trench bottom, but do not over-compact clay into a smeared, impermeable surface. If ground is soft, dig out weak material and replace with Type 1 sub-base or lean mix concrete, compacted in layers no deeper than 150mm. Water dusty layers and compact until they no longer move underfoot. For a shed base or garage slab, use 100mm compacted sub-base under the concrete. For a strip foundation, the trench bottom is the formation, so it must be clean and firm.
Proof rolling is a simple test: drive a small roller or plate compactor slowly over the formation. If it ruts or pumps, it is not ready. A sharpened steel rod should resist firmly and evenly. Take levels across the whole footprint. A fall of more than 1:80 can cause concrete to flow, so correct dips before pouring. Mark target levels on trench sides with a marker or nails.
Water is the enemy of foundations. The trench should drain away from the building, not collect water like a canal. In heavy clay, consider a French drain or land drain around the perimeter, connected to a soakaway or surface water system. Never let surface water run into the trench. In wet weather, cover the excavation with tarpaulin and pump out standing water before pouring. In winter, protect the formation from frost; frozen ground can heave. In summer, dry clay can shrink and crack, so damp it slightly before concrete arrives.
Tree roots are a common cause of subsidence. If you find roots thicker than 25mm, do not simply cut them out and carry on. Removing a large root can cause clay to swell; leaving it can lead to future shrinkage. A root barrier or deeper foundation may be needed. Check with your local authority if the tree is protected by a Tree Preservation Order. For a shed base, keep roots away and use a geotextile membrane under the sub-base.
In England, Wales and Northern Ireland, most foundations for habitable buildings need building control approval. Scotland has a similar process through the local authority. The building control officer will inspect the excavation before concrete is poured — often called the foundation or pre-pour inspection. Take photographs of the trench, reinforcement and levels. Have drawings and structural calculations on site. Once the officer is satisfied, you can pour. Do not pour first and ask later; you may be ordered to break out concrete, which is expensive. Book the inspection early and keep the site tidy. A few minutes with a clipboard can save a week of remedial work.
Concrete is heavy and unforgiving. A well-prepared formation gives you a foundation that will stay put for decades. Work to the drawings, never guess on depth or compaction, and ask a qualified tradesperson or building control officer if in doubt. Your future self — and your brickwork — will thank you.